Print Increase Font Decrease Font Normal Font

Track Record in Tertiary Institutions

One of the largest expenses of running a business today is the cost of providing and maintaining facilities. As a result, organisations with a large number of buildings or a campus with significant square footage are implementing best practices to give them greater visibility into their facility assets, improve operational efficiencies, and increase facility utilisation. Facilities managers are under increasing pressure to provide a well-maintained building while under increased budgetary constraints and with increased regulatory requirements.

IBM Maximo provides the tools to effectively maintain facilities in today’s challenging environment. Maximo also provides unparalleled visibility into the facility portfolio, and the nature and volume of work being performed to maintain those sites.

Read these case studies on how IBM Maximo is addressing asset management challenges in two Australasian universities.

University of Auckland minimises asset risks with IBM Maximo

A Certus Solutions Case Study

Existing Maximo version 4.0.3 user the University of Auckland wanted to upgrade to Maximo 6.2.1 and deploy the solution across its complex array of property assets. The challenge was to gain more control over job costing and project tracking; increase financial rigour and consolidation between the asset register and the financial systems; and better reconcile project and maintenance spending.

PDF logo Read this case study on Certus' enterprise asset management work with the University of Auckland.

The Australian National University reduces reactive maintenance and boosts compliance with Maximo software

An IBM Case Study

ANU’s Facilities and Services Division is responsible for facilities management including building and asset maintenance. To reduce reactive maintenance times at the ANU main Acton campus, as well as to meet rigorous safety regulations and more effectively manage its 150 buildings and 14,000 related assets, the division chose IBM Maximo  to replace its outdated legacy system.

PDF logo Read this case study on IBM's Maximo implementation at The Australian National University

 

Interested in learning how Certus can contribute to facilities management projects in your university? Contact us today to book an appointment.